Bridge work

Bridge and culvert photographs from site.

Used for bridges and culverts.

Photographs from site.

road

Bitumen

Method

The line is set out before the mix arrives. Tippers bring the bitumen. Vibratory rollers finish the surface. The same people lay bitumen and concrete.

Procedure

  1. 01

    Measure the road. The scope comes before a promise.

  2. 02

    Shape the run with the grader and the backhoe loaders.

  3. 03

    Bring the bitumen with the tippers.

  4. 04

    Lay the course on the measured line.

  5. 05

    Roll with the vibratory rollers.

  6. 06

    Leave a surface the next journey can use.

road

Pavement concrete

Method

Concrete for a road comes from the ready-mix plant and the transit mixers. The line is measured, the slab is placed, and the finish is for a yard, a plant, or a public run.

Procedure

  1. 01

    Set out the road.

  2. 02

    Batch at the ready-mix plant.

  3. 03

    Carry the concrete in the transit mixers.

  4. 04

    Place the slab on the measured line.

  5. 05

    Finish the surface for the yard or the public run.