road
Bitumen
Bitumen for roads that are measured and laid for a smoother run.
These photographs are of jobs done in 2021.
Method
The line is set out before the mix arrives. Tippers bring the bitumen. Vibratory rollers finish the surface. The same people lay bitumen and concrete.
Procedure
- 01
Measure the road. The scope comes before a promise.
- 02
Shape the run with the grader and the backhoe loaders.
- 03
Bring the bitumen with the tippers.
- 04
Lay the course on the measured line.
- 05
Roll with the vibratory rollers.
- 06
Leave a surface the next journey can use.
Photographs
Work in this category
Book a visit about this material All materials
Plant. The machines that move this material.