Work

Bitumen roads

Bitumen roads, measured and laid for a smoother run.

Used for plant yards and public roads.

These photographs are of jobs done in 2021.

road

Bitumen

Method

The line is set out before the mix arrives. Tippers bring the bitumen. Vibratory rollers finish the surface. The same people lay bitumen and concrete.

Procedure

  1. 01

    Measure the road. The scope comes before a promise.

  2. 02

    Shape the run with the grader and the backhoe loaders.

  3. 03

    Bring the bitumen with the tippers.

  4. 04

    Lay the course on the measured line.

  5. 05

    Roll with the vibratory rollers.

  6. 06

    Leave a surface the next journey can use.

Roads poster with a survey tripod, roller, and backhoe
Precise planning. A strong foundation. A better road.

Book a visit about this work

Services. The kind of work this job belongs to.