A yard needs bays, lines, and signs before the machines move. Thermoplastic paint marks the bays. Plotting sets out a new site the same way: the line first.

Procedure

  1. 01

    Plot the yard or the new site.

  2. 02

    Mark the bays.

  3. 03

    Lay the thermoplastic lines.

  4. 04

    Fix the signs.

  5. 05

    Leave a yard the machines can circulate in.