wall
Gabion stone
Stone held in mesh, for slopes and channels.
These photographs are of jobs done in 2021.
Method
The stone stays in the mesh. The wall follows the slope or the channel. The line is set to the ground.
Procedure
- 01
Walk the slope or the channel.
- 02
Set the mesh to that line.
- 03
Fill the mesh with stone.
- 04
Keep the stone inside the mesh.
- 05
Leave the wall following the ground.
Photographs
Work in this category
Book a visit about this material All materials
Plant. The machines that move this material.